PREMIER-FOODS

Premier Foods

The multi-million pound investment ‘Project Snow’ involved the refurbishment of the production lines at Premier Foods. Including the renewal of the suspended ceilings, which in turn required adapting the existing fire sprinkler protection system, the nature of the work meant work was restricted to over-night and weekends.